Today, AHCE has an outstanding track
record in the cruise, yacht and ferry sector, having consistently demonstrated
its unbeatable combination of reliable, accurate and punctual design, in tandem
with the “total”, timely and professional management of follow-up build
projects.
>
Cruising Ships
>
Yachts
>
Ferry Boats
>
Navy, Other Vessels & Offshore Activities
>
Landsite Activities
|
|
|
YACHTS
|
 |
“M/Y CHRISTINA O”

Owner :
Shipyard : Split – Croatia, Conversion
Date : 2000-2001
Project : Design of new HVAC System for an extensive conversion, issuing of
specifications for the machinery, management of the project,submission of
drawings to the Authorities and Classification Societies. Approvals
L.O.A. : 99 m |
 |
“M/Y PRINCE ABDUL AZIZ”
Owner :
Shipyard : Hephaestus Hellas Shipyards S.A. – Greece
Project : Upgrading (designing and contracting) of the Automation System for the
A/C plant.
L.O.A. : 99 m |
 |
“M/Y TUEQ”

Owner : SETE S.A (project name Triton)
Shipyard : Greece
Date : 2001
Project : Support to the owners for issuing specification for the A/C System.
Auditing of the complete design for the Ventilation and A/C System.
Construction, survey and submission of respective report.
L.O.A. : 99 m |
 |
“M/Y EXPEDITION”
Owner :
Shipyard :
Project : Preliminary design for the A/C System.
L.O.A. : 90 m |
 |
“M/Y HANSE”
Owner : Alpha marine
Shipyard : Perama Shipyards – Greece, Conversion. Date: 2002
Project : L.O.A.: 50 m Design of a new HVAC System |
 |
“M/Y ASTARTE II”
Owner :
Shipyard : Piraeus – Greece
Project :L.O.A.: 100 m Survey of the A/C System. Submission of respective report
for upgrading the HVAC System. |
 |
""
Owner : Sea Charter Co.
Shipyard : Cantiere Navale De Poli S.p.A. – Italy
Project : Not numbered new-building. L.O.A.: 71 m Basic design for the A/C and
Ventilation System |
 |
“ANNALIESSE”
Owner : Liveras Yachts
Shipyard : Neorion Shipyards – Greece, New Building 1101. Date: 2001-2002-2003
Project :L.O.A.: 85.3 m Complete design for the A/C and Ventilation System.
Issuing of the corresponding
specifications for the air handling machinery etc. Management, supervising and
commissioning of the
complete HVAC system. |
 |
“ALYSIA”
Owner : Liveras Yachts
Shipyard : Neorion Shipyards – Greece, New Building 1102. Date: 2003-2004-2005
Project : L.O.A.: 85.3 m Complete design for the A/C and Ventilation System.
Issuing of the corresponding
specifications for the air handling machinery etc. Management, supervising and
commissioning of the complete HVAC
system. |
 |
“S/Y EUGENE EUGENIDES”
Owner :
Shipyard : Piraeus – Greece
Project : L.O.A.: 60 m Survey of the A/C System. Submission of respective report
for upgrading the HVAC System. Design of a completely new HVAC System.Issuing of
the corresponding specifications for the air handling machinery etc.Management
and supervising of the complete HVAC system. |
 |
“M/Y HAMLET”
Owner :
Shipyard : Piraeus – Greece. Date: 2008
Project :L.O.A.: 50 m.Design of HVAC System , Heat - load calculations, Single
line diagrams. Submission of drawings to the Authorities and Classification
Societies. Approvals |
 |
“P/V H 260”
Owner : Alpha marine
Shipyard : Piraeus – Greece. Date: 2008
Project :L.O.A.: 97.3 m. Complete design for the A/C and Ventilation System.
Heat Load calculations, One Line Diagram,Electric Load and PowerAnalysis,
Issuing of the corresponding specifications for the air handling machinery. |
 |
“M/V UNIVERSAL MK1”
Owner : Alpha marine
Shipyard : Piraeus – Greece. Date: 2008
Project :L.O.A.: 57 m. Complete design for the A/C and Ventilation System.
Heat-load calculations, One Line Diagram, Electric Load and Power Analysis.
Issuing of the corresponding specifications for the air handling machinery. |
 |
“M/Y BELENA”
Owner :
Shipyard : Piraeus – Greece. Date: 2009
Project :L.O.A.: 50 m. Design of HVAC System , Heat - load calculations, Single
line diagrams. Submission of drawings to the Authorities and Classification
Societies. Approvals. |
|