Today, AHCE has an outstanding track
record in the cruise, yacht and ferry sector, having consistently demonstrated
its unbeatable combination of reliable, accurate and punctual design, in tandem
with the “total”, timely and professional management of follow-up build
projects.
>
Cruising Ships
>
Yachts
>
Ferry Boats
>
Navy, Other Vessels & Offshore Activities
>
Landsite Activities
|
|
|
NAVY, OTHER VESSELS
& OFFSHORE ACTIVITIES
|
 |
HELLENIC NAVY REPLENISHMENT VESSEL
Owner :Hellenic Navy
Shipyard : Elefsis Shipyards
Project : Serving as consultants to the yard for various HVAC system
issues.Survey, airflow measurements. Design. Issuing of specifications of
necessary machinery. Supervision of works for the upgrading of the existing A/C
and Ventilation System. Production of “as fitted” drawings. |
 |
HELLENIC NAVY FAST ATTACK CRAFTS
Owner :Hellenic Navy
Shipyard : Elefsis Shipyards
Project : Hellenic Navy Fast Attack Crafts.Serving as consultants to the yard
for various HVAC system issues. Auditing of the design of the A/C System and
respective summer tests.Airflow measurements. |
 |
BRAZIL PETROBRAS
Owner : Brazil Petrobras
Shipyard :
Project : Complete basic design for the A/C & Ventilation system, including all
accommodation spaces, technical and electrical spaces, stores, workshops
etc.Issuing of specifications for the air handling machinery etc. |
 |
LNG FPSO
Owner : LNG FPSO
Shipyard :
Project :Complete basic design for the A/C & Ventilation system, including all
accommodation spaces, technical and electrical spaces, etc. |
 |
LIVESTOCK CARRIER
Owner : Livestock Carrier
Shipyard : Lamda Shipyards – Greece. Date: 2004
Project :Complete basic design for the A/C & Ventilation system, issuing of
specifications for the air handling machinery etc. |
 |
HALTON MARINE
Owner : Halton Marine. Date: 2004
Project :Energy Calculations for a Marine A/C System Production of the model of
a Marine A/C System for accommodation areas, defining the various factors
influencing the efficiency of the system creating a suitable algorithm for
determining the efficiency, evaluation of the results. |
 |
RO-RO VEHICLE CARRIER
Owner : Carrier
Shipyard : Elefsis Shipyards – Greece
Date :
Project :Participation in the design of a prototype system for passenger
vessels. |
 |
HALTON MARINE
Owner : Halton Marine Date. Date: 2006
Project :Calculation of energy consumption and energy savings for an A/C system
where low radiation glazing panels are replacing the ordinary one and the air
system is using low temperature supply air. |
 |
“R/S PROMITHEUS”

Owner : Hellenic Navy,
Shipyard : Elefsis Shipyards – Greece. Date: 2005
Project : (General Support and Replenishment Ship) Heat load calculation for
several spaces due to poor performance of the A/C system.Detailed calculations
for main engines’ air inlet systems due to serious deformation of the existing
ducts |
 |
“LYKOUDIS”
Owner : Hellenic Navy, Date: 2007
Project : (Lighthouse tender ship) Design of A/C System and issuing of
specifications for the conversion of the system. |
 |
“DEEPWATER SEMI-SUBMERSIBLE DRILLING UNIT H1188”
Owner :
Shipyard : Wilhelmsen Marine Engineering. Date:2008-2009
Project : Complete design of A/C system for the accommodation area including
good for construction drawings, specification of the machinery etc.Complete AV /
AC electrical drawings including panel layout, logic diagrams, software
development, Factory acceptance tests (FAT). |
|